Show Me Pilots / Commercial pilot
CPL
Commercial pilot training in St. Louis
A commercial pilot certificate is the one that lets you be paid to fly. It is mostly an exercise in precision and in accumulating the right hours: 250 hours total time, with specific cross-country and training requirements inside that.
I can do the maneuver training, the ground work and the checkride prep. Some requirements need a different airplane than mine — that is normal and arranged separately, and I will tell you exactly where you stand before you start spending.
Requirements
What it takes.
- Total time250 hours
Including 100 hours as pilot in command and 50 hours of cross-country, with specific sub-requirements inside those.
- Training20 hours of training on the commercial areas of operation
10 hours of instrument training and 10 hours in a complex or technically advanced airplane among them.
- NoteThe complex requirement needs another airplane
A Cessna 150 is not complex or technically advanced, so that portion is arranged separately. Every independent instructor handles this the same way and it is a solved problem, not a surprise.
- WrittenThe commercial knowledge test
Ground instruction is $25 an hour and I will sign you off when you are ready for it.
- CheckrideOral exam and flight test
With an FAA-designated examiner, to commercial tolerances.
An instrument rating is not strictly required for a commercial certificate, but without one your commercial privileges are limited in ways that make it impractical for real work. In practice, do the instrument rating first.
Questions
Commercial pilot questions.
How many hours do you need for a commercial pilot certificate?
250 hours of total time under Part 61, including 100 hours as pilot in command and 50 hours of cross-country flight, with further specific requirements inside those totals. For most pilots, getting from their current hours to 250 is the largest part of the project.
Can I do commercial training in a Cessna 150?
Most of it, yes — the maneuvers, the cross-country time and the checkride prep. The 10 hours required in a complex or technically advanced airplane need a different aircraft, which is arranged separately. I will be straight with you about which parts happen where before you commit to anything.
Do I need an instrument rating before a commercial certificate?
Not legally, but practically yes. A commercial certificate without an instrument rating carries restrictions that make it close to useless for actual commercial work, so almost everyone does the instrument rating first.
What is the cheapest way to build hours toward 250?
Generally, flying cross-country with other pilots splitting cost, and using a cheap-to-run airplane rather than renting something expensive by the hour. This is worth planning deliberately rather than drifting into, because the difference between an efficient plan and an inefficient one is thousands of dollars.
Talk it through
Bring me your logbook totals.
Tell me your hours and certificates and I will map out what is left, what it costs, and which parts need an airplane other than mine.
If a different setup gets you there cheaper, I would rather tell you than take the work.
Keep reading
More on training here.
- Flight training costWhat it all costs, line by line.
- Discovery flightYour first flight, $50, you fly the airplane.
- Private pilot licenseFrom zero hours to a certificate.